The Ministry of Roads and Highways acting through the Department of Urban Roads has announced that traffic diversions are being carried out on the Accra-Tema Motorway, owing to the construction of the bridge over the motorway to connect Flowerpot to East Legon.
This announcement was released in a press statement by the ministry on Monday, September 4, 2023.
Motorists have been advised to exercise caution and drive at the posted speed limit by adhering to the traffic management signs provided during this period.
“6 no. height restriction gantries (4.5 metres) will be positioned at different locations across the Accra Tema Motorway prior to reaching the construction zone. Vehicles exceeding 4.5 metres in height will be redirected to exit the stretch through the designated route”, the statement read.
Read below the full statement: